Factory Supply Mini Load Asrs - Heavy duty electrical movable roll-out cantilever racking – Ouman

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

Our goal is to provide high quality products at competitive prices, and whole heartedly service to customers around the world. We are ISO9001, CE, and GS certified and strictly adhere to their quality specifications for Automated Retrial System, Four Way Shuttle, Agvs Pallet Trucks, We are always looking forward to forming successful business relationships with new clients around the world.
Factory Supply Mini Load Asrs - Heavy duty electrical movable roll-out cantilever racking – Ouman Detail:

Product Introduction

Roll-out Cantilever Racking is an improvement type of traditional cantilever rack.Compared with the standard cantilever rack, the cantilever arms can be retracted, and no need forklifts and wide aisles. With the using the crane to store goods directly, which saves space, especially for companies with limited workshops.
The Roll Out Cantilever Rack can be divided in to double sided and single side two type of cantilever racking. Each cantilever roll-out rack unit is designed with a specific advantage for the end user, whether it be maximum weight capacity, or largest dimension to house long pieces of material.

Technical Data of Cantilever Rack

Product Name Roll-out Cantilever Racking
Brand Name OUMAN/ OMRACKING
Material Steel Q235 
Size L4300*W1725*H3615mm and other sizes are also available
Levels Normally 5levels, Base+ Roll-out levels+ Top fixed level
Load Capacity 4000kg max loading
Arm Length Customize size
Arm Loading 500kg-1000kg loading per arm
C/C Distance Customize
Certificate CE,ISO,SGS,AS 4084
Usage For long shape materials

Features of Roll-out Cantilever Rack

1.The cantilever is retractable and no need to use forklifts and aisles for forklift operation, which help to save much more space.
2.Roll-out cantilever rack can be used to store pipes, plates, large pieces, shafts, and irregular-shaped goods and long shape material.
3.Max load capacity can reach 4000kg load.
4.Roll out cantilever rack can be designed with single side and double side cantilever rack.
5.Easy to operate and install.

Advantages of the Roll-Out Rack

● Warehouse space is saved and gained
No forklifts are used and small aisles are required and just to use cranes to load and unload the long shape materials
● Racking is much more safe.
The long materials are stored on the beams freely, no need put the materials on the shelving.
● Operation can save much more time.
Without restacking using the hall crane, the racks can be loaded, or transport vehicles can be loaded or unloaded.
● Whole rack structure is easy to operate.
The rack can usually be operated by one person.


Product detail pictures:

Factory Supply Mini Load Asrs - Heavy duty electrical movable roll-out cantilever racking  – Ouman detail pictures

Factory Supply Mini Load Asrs - Heavy duty electrical movable roll-out cantilever racking  – Ouman detail pictures

Factory Supply Mini Load Asrs - Heavy duty electrical movable roll-out cantilever racking  – Ouman detail pictures


Related Product Guide:

Often customer-oriented, and it's our ultimate target to become not only probably reputable, trustable and honest provider, but also the partner for our customers for Factory Supply Mini Load Asrs - Heavy duty electrical movable roll-out cantilever racking – Ouman , The product will supply to all over the world, such as: Ukraine, Israel, Oman, Our products are widely recognized and trusted by users and can meet continuously changing of economic and social needs. We welcome new and old customers from all walks of life to contact us for future business relationships and mutual success!
  • It is a very good, very rare business partners, looking forward to the next more perfect cooperation!
    5 Stars By Penelope from Cologne - 2018.06.18 19:26
    The goods are very perfect and the company sales manager is warmful, we will come to this company to purchase next time.
    5 Stars By Jo from US - 2017.07.07 13:00
    Write your message here and send it to us